Notre Dame Block B Redevelopment

You need Adobe Flash Player installed to see the gallery of images. Click here to be taken to the Adobe site to download it.

Category

Educational

Location

Shepparton

Year

2007

Cost

$2.0m

Overview

Design, documentation and contract administration of the demolition of the existing 'B' Block and construction of a new two storey 'B' Block consisting of classrooms, offices, common room, lockers, student toilets and storage areas.

The result has been a dynamic building offering vistas across the oval as well as into the courtyard. Integration with the existing buildings was achieved through hybrid building elements moving from modern to traditional reflecting both Notre Dame's history but also it's future.